N_031.mp4
: If replacing the system chip, ensure the notch faces the correct direction to avoid frying the board.
The angle sensor ensures the crane's boom is at the correct pitch for safe lifting.
: Reconnect hoses and bleed the air from the hydraulic lines to ensure accurate readings. ⚠️ Critical Safety Checks n_031.mp4
: Fully retract the boom. Turn the potentiometer counter-clockwise until it stops to reset the "zero" point.
: Test that the system successfully disables crane functions during an overload condition. : If replacing the system chip, ensure the
: Remove old wires from the terminal block and connect the new assembly.
The filename n_031.mp4 frequently appears in technical contexts related to crane systems, specifically associated with documentation for the DS 350 and EI 65 series Load Moment Indicators (LMI). ⚠️ Critical Safety Checks : Fully retract the boom
: Lower the boom completely to remove rest pressure. Disconnect hydraulic hoses.