Gb12xzip ⚡ Premium
: Surfaces must be dry and free of frost or standing water.
: Wear safety goggles and protective gloves; use in well-ventilated areas to avoid vapor exposure. GB12xzip
: Install panels with the built-in water-resistive barrier facing outward. : Surfaces must be dry and free of frost or standing water
The following guide outlines the core installation steps for the ZIP System as detailed by Huber Engineered Woods and Lowe's : 1. Panel Installation though local regulations may vary.
: Avoid applying tape if the tape itself is below 20°F (-6.7°C) .
: ZIP System Roof & Wall sheathing is often intended to replace the first layer of underlayment required by building codes, though local regulations may vary.