G003.zip (TOP)
: Cut your wrap panels roughly 1/2 inch shorter than the total height to allow for easier positioning and to prevent moisture wicking from the ground. 2. Assembly (The "Zip" Method)
Before starting, inspect the existing post for structural soundness. Measure the total height from the floor to the underside of the beam or ceiling. G003.zip
: Join the halves together by engaging the remaining teeth. Squeeze or use a clamp until the wrap is fully locked and tight. 3. Bonding and Leveling : Cut your wrap panels roughly 1/2 inch
: Converts boring or rusted metal pillars into finished, paintable columns. Measure the total height from the floor to
For the standard four-piece system, follow these steps to ensure a tight fit:
: Connect two pieces using their initial interlocking teeth to create two L-shaped halves. Position : Place the two halves around the structural post.
: Modern materials like PVC or Fiberglass (FRP) are resistant to rot, moisture, and insect damage, making them ideal for both interior and exterior use.